Rendering

Proven before promised.

Shipowners have been sold a lot of green promises. We'd rather show our working. Everything on this page was done by someone other than us.

Independent validation.

BodyWhat they didResult
DNVReviewed the design, engineering analysis and CFD against class requirementsApproval in Principle, 6 September 2021
Wolfson Unit, University of SouthamptonWind tunnel testing of the triple-wing rigLift and drag data used in the performance model
Lloyd's RegisterComputational fluid dynamics analysisCompleted
Cape Horn EngineeringAerodynamic performance optimisationCompleted
The triple-wing model under test in the R J Mitchell wind tunnel, University of Southampton. Watch on YouTube
Airflow around the rigs, from the aerodynamic optimisation by Cape Horn Engineering. CFD video. Watch on YouTube

“This is not an unreasonable projection provided appropriate operational routes using optimal routing are adopted and at ships speeds below 12 knots.”

Wolfson Unit conclusions, on Windship's projection of about 30% annual savings for a rigged bulker or tanker

What Approval in Principle means.

Approval in Principle is a classification society's formal confirmation that a new design is feasible and that no significant obstacle stands in the way of full approval.

It follows detailed engineering review. The next step is Type Approval, which certifies the production design for installation on ships.

Windship will complete Type Approval with its first launch partner, so that the certified design reflects a real vessel class.

Patents.

30+ granted across 12+ jurisdictions. PCT filed 1 July 2013; terms run to July 2033.

JurisdictionNumberStatus
Europe, validated in 20 countriesEP 2 867 117 B1Granted 13 Nov 2019
United StatesUS 11,027,808 B2Granted 8 Jun 2021
JapanJP 6470685 B2Granted
South KoreaKR 10-1991546 B1Granted
SingaporeSG 11201408675TGranted
AustraliaAU 2013282975 B2Granted
CanadaCA 2880376 CGranted
New ZealandNZ 704193Granted
BrazilBR 112014032800Granted
South AfricaZA 2015/00612Granted
ChinaCN 104619586 APending
India583/CHENP/2015Pending

What we haven't done yet.

The Windship rig has not yet sailed on a commercial vessel. That's the next step, and it's the one we want to take with a launch partner.

Being honest about that is part of how we work.

We're looking for the first fleet.

An owner or operator who shares our belief and wants their vessels to be the ones the rest of the industry studies.

Windship rigs on a Panamax bulk carrier, profile. Illustrative.